Facts... |
|
|
|
| Project
objective |
|
|
| Description |
- Architecture
- Permanent material (no maintenance)
- High standard inside
- High sound-proofing demands
- Good air quality
- Best available technology
- Attractive central location
- Individual metering
|
| Technology |
|
|
| Project organisation |
- Architect/designer: bsv arkitekter och
ingenjörer
- Heating, ventilation and sanitary
system designer: FLK in Växjö
- Electricity designer: BLMB elteknik in
Ljungby
- Ssupport: Hans Eek, Svein Ruud, Eje
Sandberg; Maria Wall, Swedish Energy Agency
- Contractors: NCC, Skanska inneklimat,
Jocknicks rör, Diö el, Säleby mark
|
| New elements in the project |
- Cost analysis of the investment
- Partnering during detailed design,
- The same designers through the whole
project
- Training in all the phases
- Sub-studies Indoor climate, sewage
effluent heat exchanger, detailed solutions
- Evaluation indoor climate & energy
balance
|
| Finances |
- Production cost
53 m
. Incl. VAT
- Contract cost
36,7 m
. excl. VAT
- Subsidy
6,7 m.
|
| Key figures |
- Production cost per m2
17300 SEK
- Rent 980 SEK per m2
and year
|
| Energy study |
- Feasibility study FLK report 2004-05
- Heat balance calculation with heat
balance calculation programme IDA
- Calculation of heating demand SP report
2004-05
- Energy demand 750-850 kwh/year
- Outer doors Arctic line
- Energy saving 205 kwh/year
- Energy saving electrical equipment and
mixers
- A++ and fittings obtained by technology procurement
- Individual metering of electricity and
hot water
- 15% to 30% more efficient than when
included in the rent
|